IMG_0095 crop

The great condo battle is about over. Le Square, poured their fourteenth floor two days ago, and today they set the fifteenth floor. The elevator shaft needs to be poured just yet, and then the final phase, the roof of the building.

The build out on the lower floors continues, with reaching the fifth floor. They have fitted out the lower floors, with the addition of windows and balcony access. On the ground floor, behind barricade walls, they are completing the fitting out. Concrete block walls have gone up, duct work is being completed, and framing is up. We can see this progress via windows carefully placed along the barricade wall around the structure.

Completion of the build will definitely be finished this month, with work continuing to outfit the building. Things are moving ahead very quickly. The open date is set for the end of year 2016.

2014_11_06_04_10_45_ssurlesquare_exterior

The completed Le Square to compare …

IMG_0096 crop b

La Catherine, (in the foreground) poured the ground floor a few days ago, and the frontage of the build is complete, we can see it above the barricade out front on Ste. Catherine’s Street.

The second floor is “in build process” and they are pouring concrete for the forms moving up from the first floor to the second.

la catherine

The completed La Catherine for comparison.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s